
Bell County runs from the Blackland Prairie around Temple to the limestone hills near Belton Lake and Salado. Outside the cities there are no building permits or zoning, so the septic permit, a floodplain check and well registration are the main county-level steps.
The Bell County Public Health District (Temple) permits septic systems, and it requires every system to be permitted regardless of lot size or acreage. Since September 1, 2024, any required affidavit must be filed with the County Clerk before the septic application, and the filed copy must go in with it; applications without it are rejected. New fees also took effect that date.
The County Engineer's FAQ says there is no building permit, building code or zoning in unincorporated Bell County. The septic application includes a Flood Plain Exemption Certificate, which goes to the County Engineer to confirm you are not building in the floodplain. The County Engineer is floodplain administrator: a structure in the floodplain must be elevated above the base flood elevation with a floodplain permit and elevation certificate, and development in the floodway is prohibited except with extensive engineering. Check the FEMA Flood Map Service Center first.
The Clearwater UWCD manages groundwater in Bell County. Every new and existing well must be registered, even if exempt. Under its rules, a domestic or livestock well is exempt from a permit on at least 10 acres (with limited exceptions for older small tracts) if it cannot produce more than 25,000 gallons a day and meets spacing rules.
The Bell Central Appraisal District has owner, legal description, roll acreage and ag (1-d-1) status. Roll acreage is not a survey.
No. The County Engineer says there is no building permit, building code or zoning in unincorporated Bell County. Septic and floodplain rules still apply.
The Bell County Public Health District. Every system needs a permit regardless of lot size.
Yes. Since September 1, 2024, affidavits must be filed with the County Clerk first and a copy included with the application.
Yes. Clearwater UWCD requires every new and existing well to be registered.
Last checked November 2026.
Get these checks pulled together for one Bell County property, with every source linked. See an example first.