For agentsFAQ

Buying land in Lee County, Texas: Giddings, Lexington, Dime Box and rural acreage

Lee County, east of Austin past Bastrop, is open farm and ranch land around Giddings and Lexington. Every septic system needs a county permit, and most new buildings need a county development permit.

What a $49 Thrive report checks for a Lee County parcel: owner and acreage on the appraisal roll, FEMA flood zone, mapped soils and septic ratings, terrain and slope, water and drainage, wildfire, zoning and land use, with every source linked. See an example report (PDF).

Lee County septic permits

Per the Lee County Permitting Department, any and all septic systems must be permitted. The county's septic instructions list $425 for a single-family home, with a 1-acre minimum lot, and $500 for other systems, which must be designed and sealed by a registered sanitarian or professional engineer. You submit the application in the owner's name with planning materials, a site and soil evaluation and directions to the site. The installation must be inspected before it is covered, with three working days' notice. The county does not accept cash.

Development permits and floodplain

The county's development permit instructions require a permit for structures over 100 square feet in unincorporated areas. If any part of the property is in the FEMA 100-year floodplain, you also need a survey and an elevation certificate, and the lowest floor must be at or above base flood elevation. Check the FEMA Flood Map Service Center.

Wells: Post Oak Savannah GCD

The Post Oak Savannah GCD covers Lee County. Check its well rules before you drill.

Parcel records: Lee CAD

The Lee County Appraisal District has owner, legal description, roll acreage and ag (1-d-1) status. Roll acreage is not a survey.

Free official lookups

Questions

How much is a septic permit in Lee County?

$425 for a single-family home and $500 for other systems.

What is the minimum lot size for septic in Lee County?

1 acre for a single-family home.

Do I need a building permit in Lee County?

Outside cities, a county development permit is required for structures over 100 square feet.

Who regulates wells in Lee County?

The Post Oak Savannah Groundwater Conservation District.

Last checked November 2026.

$49

Get these checks pulled together for one Lee County property, with every source linked. See an example first.

Nearby counties