For agentsFAQ

Buying land in Waller County, Texas: Hempstead, Waller and Brookshire

Waller County sits on the flat prairie west of Houston, between the Brazos River and Cypress Creek. Much of it is low and slow-draining, so floodplain rules shape what you can build and which septic system you can use.

What a $49 Thrive report checks for a Waller County parcel: owner and acreage on the appraisal roll, FEMA flood zone, mapped soils and septic ratings, terrain and slope, water and drainage, wildfire, zoning and land use, with every source linked. See an example report (PDF).

Waller County septic permits

The Waller County Environmental Division (929 5th St, Hempstead) permits septic systems. The county's Septic 101 guide says you must first pull a building development permit from Road & Bridge; then an engineer or registered sanitarian does the soil analysis and design based on the home's size and bedrooms. Its TCEQ-approved local order requires a permit for every system regardless of acreage.

Floodplain: no net fill, and septic limits

If the land is in the floodplain, a Floodplain Development Permit or exemption is needed before the septic application. The county's floodplain checklist says no net fill is allowed in the floodplain and calls for elevation certificates both before and after the house is built. Under the local order, septic systems cannot be installed in the floodway, and only aerobic systems with surface application are allowed in the floodplain. Check the parcel on the FEMA Flood Map Service Center before you plan the house pad.

Wells: Bluebonnet Groundwater Conservation District

The Bluebonnet GCD covers Waller, Austin, Grimes and Walker counties. All wells must be registered with the district; exempt domestic and agricultural wells register without an operating permit, while commercial, public-supply and other non-exempt wells also need one.

Parcel records: Waller CAD

The Waller Central Appraisal District has owner, legal description, roll acreage and ag (1-d-1) status. Roll acreage is not a survey.

Free official lookups

Questions

What comes first in Waller County, the septic permit or the development permit?

The development permit from Road & Bridge, plus a floodplain permit or exemption if needed. The septic permit comes after.

Can I put a septic system in the floodplain in Waller County?

Not in the floodway. In the floodplain, the county order allows only aerobic systems with surface application.

Can I bring in fill dirt in the Waller County floodplain?

The county checklist says no net fill is allowed in the floodplain.

Do I need to register a well in Waller County?

Yes. All wells must be registered with the Bluebonnet Groundwater Conservation District.

Last checked November 2026.

$49

Get these checks pulled together for one Waller County property, with every source linked. See an example first.

Nearby counties