
Washington County is rolling farm and ranch land around Brenham and Burton. Outside the cities there are no county building permits, but septic and floodplain permits are required, and both run through one county Environmental Health office.
Washington County Environmental Health, a division of Engineering and Development Services (3650 Hwy 36 N, Brenham), permits septic systems countywide. Any new, altered, repaired or enlarged system needs a permit before work begins, regardless of acreage; tank pumping does not. Applications go through MyGovernmentOnline. The county's permitting sheet (rev. 2018) lists a $200 fee for single-family residential, says applications expire after one year, and notes that the county does not require aerobic systems: any type that meets code is allowed. Maintenance providers must be registered with the county.
Because the county is in the National Flood Insurance Program, development in the floodplain in unincorporated areas needs a permit and written authorization before work starts. The county's floodplain sheet (rev. 2018) lists a $100 determination/permit fee for single-family residential and says general agricultural activity in the floodplain is exempt. Inside Brenham or Burton, ask the city instead. Check the parcel on the FEMA Flood Map Service Center first, especially near the Brazos River and its creeks.
The County Engineer's permit list says no building or electrical permits are required in unincorporated Washington County. A culvert permit is needed for a driveway on a county road, and subdividing a tract needs a subdivision application or variance letter; Environmental Health reviews subdivisions for floodplain and septic suitability.
Washington County is not in a groundwater conservation district, so there is no local district well permit. The neighboring Bluebonnet GCD covers Austin, Grimes, Walker and Waller counties but not Washington. Local news reported in December 2025 that commissioners were researching groundwater district options, so check for changes. Get the well log and a recent yield test for any well you rely on.
The Washington Central Appraisal District has owner, legal description, roll acreage and ag (1-d-1) status. Roll acreage is not a survey.
No. The county says no building or electrical permits are required outside city limits, but septic, floodplain, culvert and subdivision approvals still apply.
Yes. Every new, altered, repaired or enlarged septic system needs a permit regardless of acreage.
No. The county says any system type that meets code may be installed.
Not currently. Commissioners were researching groundwater district options as of December 2025.
Last checked November 2026.
Get these checks pulled together for one Washington County property, with every source linked. See an example first.