For agentsFAQ

Buying land in Wise County, Texas: Decatur, Bridgeport, Boyd and rural acreage

Wise County, northwest of Fort Worth, is ranch country around Decatur, Bridgeport and Boyd that is filling in with acreage homesites. There is no county building permit, but septic permits, minimum lot sizes and platting rules apply.

What a $49 Thrive report checks for a Wise County parcel: owner and acreage on the appraisal roll, FEMA flood zone, mapped soils and septic ratings, terrain and slope, water and drainage, wildfire, zoning and land use, with every source linked. See an example report (PDF).

Wise County septic permits

Wise County Environmental Services (Decatur) permits septic systems. Its permit sheet, updated April 2024, lists $360 for a standard system and $560 for an aerobic system or anything requiring testing. Aerobic applications need a design by a registered sanitarian or engineer, a filed affidavit and a two-year maintenance contract. Repairs and alterations are half the current fee, and a permit expires one year from payment.

Minimum lot sizes and platting

Since February 3, 1997, minimum lot sizes are 1 acre with public water and 2 acres with a private well; a smaller lot needs a warranty deed showing it existed before then. Since May 15, 2000, land divided into tracts of 10 acres or less is referred for platting.

No county building permit

The county's FAQ says Wise County does not require general building permits, though septic permits are required and cities and ETJs have their own rules. Check the parcel on the FEMA Flood Map Service Center, especially near Lake Bridgeport and the West Fork of the Trinity.

Wells: Upper Trinity Groundwater Conservation District

The Upper Trinity GCD covers Wise County. New wells, including exempt household wells, must be registered before drilling.

Parcel records: Wise CAD

The Wise County Appraisal District has owner, legal description, roll acreage and ag (1-d-1) status. Roll acreage is not a survey.

Free official lookups

Questions

How much is a septic permit in Wise County?

$360 for a standard system and $560 for an aerobic system or anything requiring testing.

What is the minimum lot size for septic in Wise County?

1 acre with public water and 2 acres with a private well, for lots created since February 3, 1997.

Does Wise County require building permits?

No general building permit outside cities, but a septic permit is required.

Do I need to register a well in Wise County?

Yes. Upper Trinity GCD requires new wells to be registered before drilling.

Last checked November 2026.

$49

Get these checks pulled together for one Wise County property, with every source linked. See an example first.

Nearby counties