
Most of Bexar County is San Antonio, but there is still rural acreage outside the city limits, especially to the south and in the Hill Country edge to the north. In unincorporated Bexar County, the county permits septic, floodplain work and building, each through a different office.
Bexar County Environmental Services (612 Nogalitos, San Antonio) permits every septic system in the county. A standard system's permit renews every 5 years: you pump the tank and send the receipt with a $30 fee. An aerobic system's first permit runs 2 years, and after that the owner keeps a service contract and the provider files quarterly reports. If a home's system was never permitted, the owner has to hire a sanitarian or engineer for a site survey and design to register it. Before buying, ask for the permit and the last pump receipt.
According to the county's FAQ, building permits in unincorporated Bexar County come from the Fire Marshal, a Floodplain Development Permit comes from Public Works if the property is in a FEMA floodplain, and a Storm Water Quality permit is needed if construction disturbs 1 acre or more. Check the parcel on the FEMA Flood Map Service Center, especially near the Medina River and Leon, Salado and Cibolo creeks.
Parts of north Bexar County are over the Edwards Aquifer recharge zone. Septic systems there fall under extra state rules (30 TAC 285.40, including lot-size and setback limits), and development may need a TCEQ Edwards Aquifer Protection Program plan.
All of Bexar County is in the Edwards Aquifer Authority's jurisdiction for Edwards wells. In northern Bexar County, Trinity Aquifer wells are managed by the Trinity Glen Rose Groundwater Conservation District, and a Trinity well drilled through the Edwards also needs an EAA permit.
The Bexar Appraisal District has owner, legal description, roll acreage and ag (1-d-1) status.
A standard system renews every 5 years with a pump receipt and a $30 fee. Aerobic systems need an ongoing service contract after the first 2 years.
The owner must hire a sanitarian or engineer for a site survey and septic design and register the system with Bexar County Environmental Services.
The Bexar County Fire Marshal. Floodplain and storm water permits come from Bexar County Public Works.
The Edwards Aquifer Authority for Edwards wells countywide; the Trinity Glen Rose GCD for Trinity wells in northern Bexar County.
Last checked November 2026.
Get these checks pulled together for one Bexar County property, with every source linked. See an example first.