
Kendall County is Hill Country land around Boerne and Comfort, where most homes outside town rely on a septic system and a private well. Septic, floodplain and development permits run through one county office, and every new well is registered with a groundwater district before drilling.
The Kendall County Engineer's Office (400 E Blanco Rd, Boerne) runs the OSSF program. The county must approve or deny an application within 30 days. Its fee schedule (effective September 2023) lists $300 for a system under 500 gallons a day and $600 at 500 gallons or more, with reinspections at $150 or $300. Aerobic systems need an Affidavit to the Public recorded with the County Clerk and a maintenance contract signed by the owner.
Septic records: the county page says to contact its development office for copies of OSSF records. The county's forms page also notes that from October 1, 2026 a Development Management Office administers the county's development rules in place of the County Engineer, so confirm which office handles your file.
The county administers a Flood Damage Prevention Order (2022). The fee schedule lists $200 for a minor and $300 for a major residential floodplain development permit. Besides the FEMA Flood Map Service Center, the county links FEMA's estimated base flood elevation viewer and the draft San Antonio River Authority (SARA) floodplain viewer, which can show newer study lines along the Guadalupe River and Cibolo Creek.
The Cow Creek GCD covers Kendall County, which sits in the Hill Country Priority Groundwater Management Area (declared in 1990) and draws mostly on the Trinity Aquifer. Under its current fee schedule, a new well needs a Certificate of Registration before drilling. Domestic and livestock wells on larger tracts can be exempt from an operating permit but still register; smaller tracts or bigger wells need a permit. The district also posts drought stages, so check the current stage before relying on a well.
The Kendall Appraisal District has owner, legal description, roll acreage and ag (1-d-1) status. Roll acreage is not a survey.
The Kendall County Engineer's Office in Boerne. From October 1, 2026 the county's Development Management Office administers its development rules.
The 2023 fee schedule lists $300 for a system under 500 gallons a day and $600 for 500 gallons a day or more.
Yes. The Cow Creek Groundwater Conservation District requires a Certificate of Registration before a new well is drilled.
Development in a mapped floodplain needs a county floodplain development permit under the Flood Damage Prevention Order.
Last checked November 2026.
Get these checks pulled together for one Kendall County property, with every source linked. See an example first.