
Wilson County, southeast of San Antonio, is fast-growing acreage country around Floresville, La Vernia and Stockdale. You need a county development permit before the county will authorize a septic system.
Wilson County's fee schedule (effective September 11, 2023) lists $250 for a single-family home not requiring a design and not in a platted subdivision, $350 for a single-family home with a conventional system, a required design or a platted lot, and $400 for commercial or alternative systems such as aerobic, low-pressure dosing and drip. The county's septic checklist requires an approved development permit and a verified 911 address before septic authorization, and aerobic systems need an affidavit and maintenance contract. An authorization to construct is valid for 12 months.
The fee schedule lists $300 for floodplain development in a Special Flood Hazard Area, plus $200 for an elevation certificate review and $500 for a drainage review if applicable. Check the FEMA Flood Map Service Center, especially near the San Antonio River and Cibolo Creek.
A residential or agricultural driveway permit is $250 under the same schedule.
The Evergreen UWCD covers Wilson County. Check its well rules before you drill.
The Wilson Central Appraisal District has owner, legal description, roll acreage and ag (1-d-1) status. Roll acreage is not a survey.
$250 to $400 depending on the system and whether the lot is in a platted subdivision.
Yes. An approved development permit is required before septic authorization.
$300 for development in a Special Flood Hazard Area, plus review fees if applicable.
The Evergreen Underground Water Conservation District.
Last checked November 2026.
Get these checks pulled together for one Wilson County property, with every source linked. See an example first.